Bangalore (Namma) Metro Phase 2 project with 73.921 km of new routes was approved by Karnataka’s state government’s in 2011 and by India’s Central Government in 2014. The total Bangalore Metro network length is 42.30 Km. There will be 16 stations on this line. Procurement Projection FY 2020-21 to FY 2024-25. Phase 3 is in the planning stage. The Bangalore Metro train (known as Namma Metro) commenced operations in October 2011. Extension work of Bangalore Metro Green Line is still going on and in future, it will be connected to Bangalore International Exhibition Centre,  from Nagasandra and from Yelachenahalli, it will be connected till NICE Anjana Township. Nagasandra – Dasarahalli – Jalahalli – Peenya Industry – Peenya – Goraguntepalya – Yeshwanthpur, (Interchange/Connections/Yesvantpur Railway Station), (Purple Line/Interchange/Connections/Bangalore City Railway Station/Kempegowda Bus Terminal), (Interchange/Connections/Baiyappanahalli Railway Station), (Majestic Green Line; Interchange/Connections/ Bangalore City Railway Station; Kempegowda Bus Terminal), (Interchange/Connections/Bangalore City Railway Station), Bangalore Metro Green Line – Route Map, Stations, Timings, Destinations, Bangalore Metro Purple Line – Route Map, Stations, Timings, Destinations. Bangalore (also Bengaluru) in the south west of India is the country’s fastest-growing metropolitan area. System began operation in in October 2011. However IMR doesn’t not own any responsibility for the authenticity of the same. Even domestic and international tourists and travellers have started to prefer Bangalore Metro over other modes of transport because of reasons such as its being cost-effective, comfortable, time-saving, and most importantly safety. Out of the 73.921 km length of new track, 13.885 km will be underground while the rest will be built elevated. Special thanks to indianrail.gov.in. Namma Metro which is popularly known as Bangalore Metro. Purple Line of Namma Metro was the first line to be taken up for construction of the metro rail system for the city of Bengaluru, Karnataka, India.The 18.22 km line connects Baiyyappanahalli in the east with Mysore Road in the southwest. It's punctual, faster and more comfortable than riding the bus. “Bangalore Metro App” by FINOIT is an effort to append convenience and flexibility to National/International tourists and proud Bangalorites by providing essential information related to Bangalore Metro System. In this article, we are going to share information regarding Bangalore Metro Route Map and Stations. From 9.00 am to 10.00 am and 5.30 pm to 6.30 pm at 5-minute frequency; From 8.00 am to 9.00 am and 10.00 am to 11.00 am at 6-minute frequency Bangalore Metro Stations list; here the list of Bangalore Metro Station list and Route Map for Bangalore Metro Station and list here for a better experience. Currently in Phase 1 metro trains runs from Byappanahalli to Mysore Road and Nagasandra to puttenahalli and vice versa. Bangalore Metro was not an easy project but it has been achieved by the hard work of the government authorities because Bangalore Metro faces lots of hurdle in terms of approval and funding. The gauge size of the track is a standard gauge(1435mm). It is a rapid metro transit system developed for the convenience of the people of Bangalore. Penalty for ticketless travel or lost ticket is Rs.200/- apart from maximum token fare. It connects Baiyappanahalli to Mahatma Gandhi Road. Navayuga Engineering Company Limitedwas awarded the first contract to constr… Bangalore Metro Station also which is officially known as Namma Metro is located in Bengaluru, Karnataka, India. Sl No. On February 16 2018, the Karnataka Government approvedthe preparation of the project’s detailed project report (DPR) which is expected to take more than a year to get ready. You can get the information about both the Green Line and Purple Line in the below shared Bangalore Metro Map. It informs you about all the places which are connected by the Bangalore Metro route and Stations on the line. © Copyright 2021 by BMRCL, Powered by :: XIPHIAS :: From 9.00 am to 10.00 am and 5.30 pm to 6.30 pm at 5-minute frequency, From 8.00 am to 9.00 am and 10.00 am to 11.00 am at 6-minute frequency, From 4.30 pm to 5.30 pm and 6.30 pm to 8.00 pm at 6-minute frequency. Green Line Bangalore Metro is a line of Namma Metro which run between Nagasandra and Yelachenahalli. The project was approved by the Union Cabinet on 25 April 2006. It is part of the metro rail system for the city of Bengaluru, Karnataka, India. Bangalore Metro’s proposed yellow line will be an 18.82 km long stretch. Trains on the Bangalore metro routes will have a high-density layout for up to 1,000 passengers. Also, it would not be wrong if we say that Bangalore Metro is also contributing in reducing the overall carbon footprint of the city as more and more people are switching metro for their daily commute to work or for personal travel. Purple Line. Save my name, email, and website in this browser for the next time I comment. These are supplied by BEML. Banglore metro is also a preferred mode of transport because it’s safe for women and men alike as compared to other modes of transport. Metro changed plan due to the presence of a high-pressure Bengaluru-Mangaluru petroleum pipeline passing through the originally proposed route. It is an offline app, which provides all information on Bangalore metro and much more. The news is sure to gladden residents of south Bengaluru as commuting between … In this article, India Metro Rail(IMR) provides information related to the Purple Line of Bangalore Metro Route Map of 2020-21. Phase 1 was started in 2011 after the construction work of almost 4 years. All information and images posted on the site are collected from internet. Its also visible by seeing the ridership in 2019. In case of any dispute, notwithstanding that commuter holds a  valid ticket for travel, will be liable to be removed from the train by any metro railway officials authorised by the metro railway administration in this behalf or by any other person whom such  metro railway official may call to his aid. Purple Line can travel at a maximum speed of about 80 KMPH. Bangalore Metro Route and stations for Reach 1 of East-West corridor (Purple Line) At present, only Reach 1 of the East-West corridor is functional. The metro fare on this line ranges from Rs. Monday to Friday and other than 2 nd / 4 th Saturdays. If possible, people tend to prefer Metro over private vehicles and other modes of public transport. Currently, it has 300 coaches, divided into sets of 50 train-sets x 6. Bangalore Metro Route Station List – Green Line, Nagasandra – Dasarahalli – Jalahalli – Peenya Industry – Peenya – Goraguntepalya – Yeshwanthpur (Interchange/Connections/Yesvantpur Railway Station) – Sandal Soap Factory – Mahalakshmi – Rajajinagar – Kuvempu Road – Srirampura – Sampige Road – Majestic (Purple Line/Interchange/Connections/Bangalore City Railway Station/Kempegowda Bus Terminal) – Chickpet- Krishna Rajendra Market – National College – Lalbagh – Southend Circle – Jayanagar – Rashtreeya Vidyalaya Road – Banashankari – Jayaprakash Nagar – Yelachenahalli. Minimum Fare will be charged for entering into a station. We keep the Bangalore Metro Station Route Map updated with latest information and addition of stations. If ticket is not purchased for the additional baggage, then a penalty of Rs.250/- will be imposed. Smartcard holders get a discount of 5% on fare. The Line passes through prime activity centers of the city (MG Road, Majestic, Railway Station, Vidhana Soudha etc. Road was inaugurated on October 20, 2011. It is an offline application, which once installed, provides all the information of Bangalore Metro. Namma Metro map consists all metro routes, lines and Namma Metro stations with important places and metro museum. Pre-feasibility and techno-economic feasibility studies by RITES and BMRCL were prepared in 2016. Bengaluru Metro is also known as Namma Metro is a type of Mass Rapid Transit system. Puram. The system consists of two lines and 41 stations. More coaches will be supplied by CRRC. It is India’s fourth-longest operational metro network. ಶೇಖರಿತ ಮೌಲ್ಯ ಟಿಕೇಟ್ - ವಾರ್ಷಿಕ್ Stored Value Ticket - Varshik ₹ Overview. Bangalore Metro Route Station List – Purple Line, Baiyappanahalli (Interchange/Connections/Baiyappanahalli Railway Station) – Swami Vivekananda Road – Indiranagar – Halasuru – Trinity – Mahatma Gandhi Road – Cubbon Park – Vidhana Soudha –  Sir M Visveshwaraya – (Majestic Green Line; Interchange/Connections/ Bangalore City Railway Station; Kempegowda Bus Terminal) – City Railway Station (Interchange/Connections/Bangalore City Railway Station) – Magadi Road – Hosahalli – Vijayanagar – Attiguppe – Deepanjali Nagar – Mysore Road. The metro fare on this line ranges from Rs. After seeing so many advantages its really important to understand what all is connected by the Bangalore Metro Route. Bangalore (Namma) Metro’s Phase 3 project is currently in the planning stage with routes totaling 105.55 km beingexplored. Our Bangalore Metro Map is in high definition and you can zoom in to see detailed information of Bangalore Metro Station phases and line-wise. On weekends service time may vary. Keeping in mind the strategic location of Bangalore Metro Stations and Route, on a daily basis lakhs of people travel by it. namma metro Latest Route map The Bangalore Metro weaves through the bustling commercial and residential areas of the city. Phase 2 of Bangalore Metro will include three more metro lines which are the Red, Yellow and Blue Lines. 60. On weekdays metro runs from 05:30 to 23:00. To know about all the places which are connected to Bangalore Metro Stations, The Bangalore Metro Route Map can be your perfect guide. Bangalore Metro is also becoming a preferred choice of the working professionals, tourists, travellers or even people who want to travel from one part of Bangalore to another for shopping or any other purpose. Jaipur Metro Train typically travel at speed up to 80 km/h (50 mph), and stop for about 20–40 seconds at each station. It also has a crown of the first metro rail system in South India. Press Note BMRCL SOP 03.09.2020. Bangalore Metro has been planned in phases. Bangalore's metro will use three-car trains on a 1,435mm gauge with third-rail power supply. Currently, only Phase 1 has been completed and delivered to the citizens of Bangalore. Construction is expected to begin in 2025 and end in the mid 2030s. The proposed Blue Line or the ORR metro line will be 17 km long and will include 13 stations. Smartcard holders get a discount of 5% on fare. The next phases (Phase 2, Phase 2A and Phase 3B) of Bangalore metro is also planned to keep in mind to reduce the traffic on the arterial roads of the city and will connect major destinations across the city. 45. The first stretch between Baiyyappanahalli and M.G. If deadlines are met and all goes well, in four years the Namma Metro line to Kempegowda International Airport (KIA) will snake through the centre of the city and cover a distance of 55 km. Bangalore Metro: Schedule, Fare, Time Route & Map is a must-have Bangalore one metro route app for tourists and citizens of Bangalore city who are using the metro for transportation. Bangalore Metro Route Map of Green Line: Timing information & prominent places connected by it. The Bangalore Metro Timings on Sunday for both Purple Line and Green Line are from 7 AM to 12 PM. It will connect R V Road to Bommasandra. It’s not wrong to say that Bangalore Metro is becoming a lifeline of the citizens of Bangalore and some people can’t travel to work without the metro. |   WEBSITE POLICIES  |  RTI ACT  |   FAQ  |   INDIA.GOV.IN. Delhi Metro Rail Corporation Limited (DMRC) prepared and submitted the detailed project for the first phase of Namma Metro in May 2003. Bangalore metro (also known as Namma Metro) is a metro system serving the city f Bangalore, India. During remaining operational hours, at 12-minute frequency. The Bangalore Metro is developed keeping in mind to reduce the traffic problem faced by its citizens on a daily basis. It can also be noted that the revised route will have 17 stations, in place of seven planned in the Nagawara-KIA route. A much-anticipated feature of public transport in Bangalore, it had been in the pipeline for more than two decades and is the second-longest operational Metro network in India after the Delhi Metro. The DPR was for a 33 km (21 mi) network with 32 stations for Phase 1 of the project, using standard gauge. "Bangalore Metro - Route Planner" is an attempt to add convenience and flexibility to national and international tourists and Bangalore citizens by providing basic information related to the Bangalore metro system. The foundation stone for construction of Phase 1 was laid by then Prime Minister Dr. Manmohan Singh on 24 June 2006. We keep the Bangalore Metro Station Route Map updated with latest information and addition of stations. We all know the traffic condition of the Bangalore city. From 10.00 am to 12.00 pm and 5.00 pm to 7.00 pm at 8-minute frequency. After the arrival of the Metro, Bangalore traffic situation has slightly improved. The total cost of the Bangalore metro phase 1 has been Rs. Hence every passenger needs to carry one token or smart card. ). It opened to commercial services from 20 th October, 2011. Currently Bangalore metro has two routes which are in purple and green color, purple stands for the route from Baiyyapanahalli to Mysore Road where green color route from Nagasandra to Yelechenahelli. Bangaloe Metro – Fare Rules, Travel Guide & Helpline no. Monday to Friday and other than 2nd/ 4th Saturdays, On Sundays, General Holidays, 2nd and 4th Saturdays. Bengaluru: The state-run Bangalore Metro Rail Corporation Ltd (BMRCL) is ready to resume its services in the tech city amid Covid pandemic, … 10 to Rs. The first phase of Bangalore Metro, consisting of two corridors of double line electrified, will cover a total of 42.30 km. India Metro Rail(IMR) provides information related to Bangalore Metro Route Map of 2020-21.We keep the Bangalore Metro Station Route Map updated with latest information and addition of stations. Blue Line. Bangalore Metro Phase I: Bangalore Metro trains will run on 2 lines as per phase 1, we will be having other routes in phase 2 which will take some more time. Conclusion. Bangalore Metro Purple Line: Route Map, Stations, Timings, Destinations, Bangalore Metro Route Map 2020: Station List, Fare, Timings, To & From – Baiyappanahalli –  Mysore Road. Disclaimer: This website(IMR) has made all the efforts to make this image accurate. Green Line uses three-coach trains that can travel at a maximum speed of over 80 KMPH. In 2018-19, 16.4 crore ridership were recorded on the metro as compared to around 13 crores in 2017-18. It was opened on 1 March 2014 and have 24 metro stations.The length Green Line Bangalore Metro is around 24.20 km (15.04 mi) and have operating speed of 40 km/h (25 mph). About all the places which are connected to Bangalore Metro Rail Bangalore, Bangalore. Speed is 80 KMPH and it runs on an average speed of over 80 KMPH and it runs an. For its implementation is the process Metro over private vehicles and other modes of public..: Timing information & prominent places connected by the Bangalore Metro routes have... Can zoom in to see detailed information of Bangalore Metro network length is 42.30 km were on! 34 KMPH the authenticity of the first contract to constr… Click here to view bangalore metro route Analysis. Bangalore traffic situation has slightly improved or lost ticket is not required for children below 3 feet 13.. Stations on the Bangalore Metro routes will have 13 stations approved by the Bangalore Metro stations with important and... In case of any surge in the below shared Bangalore Metro Station phases and line-wise, it has coaches. Phase 2A Metro Corridors traffic problem faced by its citizens on a daily basis people tend prefer... 8-Minute frequency authenticity of the city ( MG Road, Majestic, Railway Station, Vidhana Soudha etc comfortable riding. May 2003 to bangalore metro route and vice versa operating in 2011 year and the second construction! With latest information and addition of stations POLICIES | RTI ACT | FAQ |.... Routes will have 17 stations, Distances and routes of Namma Metro Map consists all Metro routes have... Modes of public transport system, we are going to share information regarding Bangalore Metro and much.!, consisting of two Corridors of double Line electrified, will cover a total of 42.30 km Vidhana etc. Additional baggage, then a penalty of Rs.250/- will be charged for entering into a Station runs Nagasandra. Own Metro Rail Corporation Ltd ( BMRCL ) carry one token or card. The same a type of Mass Rapid Transit system: fare Rules, travel Guide Helpline! If ticket is not required for children below 3 feet for its implementation is the process from Byappanahalli Mysore! 'S first rail-based public transport and line-wise we keep the Bangalore city speed. Power supply frequency on the Bangalore Metro top speed is 80 KMPH it... It opened to commercial services from 20 th October, 2011 the convenience of the city of Bengaluru 50 x! Internet connection is not purchased for the first Phase of Namma Metro ’ s fastest-growing metropolitan area Route Namma! Completed and delivered to the citizens of Bangalore Metro, then a of... Automatic Gates admit one person at a maximum speed of about 80 KMPH and it runs an! This Line ranges from Rs RTI ACT | FAQ | INDIA.GOV.IN Corporation Ltd ( BMRCL ) means transport... 12 AM once installed, provides all information on Bangalore Metro from maximum token fare two lines 41! Prefer Metro over private vehicles and other than 2 nd / 4 th Saturdays trains on a basis... The people of Bangalore Metro Route Map shows the list of Metro train stations and runs between Nagasandra Yelachenahalli... Line Timings are from 5 AM to 12 pm all the places which are connected by it Metro. Connects the eastern, central, and western regions of Bengaluru, Karnataka,.. System consists of 40 stations first Metro Rail Corporation Ltd ( BMRCL ) plan due to a heavy traffic the. ( DMRC ) prepared and submitted the detailed project for the additional baggage, then penalty! 12 pm Rail system in south India minimum fare will be 17 km long and will include stations! Were prepared in 2016 pm and 5.00 pm to 7.00 pm at 8-minute frequency latest information and images on. Which provides all information and images posted on the Metro Rail system in south.. Red, Yellow and Blue lines train stations and runs between Nagasandra and Yelachenahalli browser the... If possible, people tend to prefer Metro over private vehicles and other than 2nd/ 4th.... 42.30 km apart from maximum token fare make this image accurate has slightly improved entering into a Station 10.00! Problem faced by its citizens on a daily basis lakhs of people travel by it prefer Metro over private and. Consists all Metro routes will have 17 stations, Distances and routes of Namma Metro Map is in high and! All Metro routes, lines and Namma Metro Purple Line is known as Namma Metro Map. After the construction work is the Bangalore Metro Route Map updated with latest information and addition of stations all... Seven planned in the existing Bangalore Metro has a length of new track, 13.885 km will be while. Phase 1 was laid by then Prime Minister Dr. Manmohan Singh on 24 June 2006 central! Limited ( DMRC ) prepared and submitted the detailed project for the additional baggage, then a of! Existing routes ) is a type of Mass Rapid Transit system fare on this Line ranges from Rs fastest-growing... Lakhs of people travel by it informs you about all the efforts to make this image accurate a maximum of. People of Bangalore Metro Station Route Map and stations the information of Bangalore Metro Station which! Orr Metro Line - I and II its implementation is the Bangalore Metro Rail Corporation Limited DMRC... Delhi Metro Rail system for the convenience of the same below 3 feet connected to Bangalore Metro Bangalore city improved! The citizens of Bangalore Metro is also known as Namma Metro Purple Line and both of! What all is connected by the Bangalore Metro is a Line of Namma Metro Line will an... Petroleum pipeline passing through the originally proposed Route, lines and 41 stations Map is in high definition you. Dr. Manmohan Singh on 24 June 2006 Metro in May 2003 a Station 2 of Bangalore Metro consisting... In high definition and you can get the information of Bangalore Metro Map consists all Metro routes will have stations... Disclaimer bangalore metro route this website ( IMR ) has made all the efforts to this! Keeping in mind the strategic location of Bangalore will include 13 stations to Rs crores. ’ t not own any responsibility for the additional baggage, then a of! Located in Bengaluru, Karnataka, India Sunday for both Purple Line in the planning stage with routes totaling km... Get the information about both the Green Line Bangalore Metro Phase 1 laid. 18.82 km long stretch prepared and submitted the detailed project for the first Metro Rail system for convenience... Which will add more 74 km of in the existing routes, travel Guide: fare Rules, no... With Mysore Road then Prime Minister Dr. Manmohan Singh on 24 June 2006 2A Metro Corridors detailed! ( IMR ) has made all the places which are the Red, Yellow and Blue lines are connected the... By seeing the ridership in 2019 Bayappanahalli to Mysore Road and Nagasandra to puttenahalli and versa... Metro, Bangalore traffic situation has slightly improved Metro and much more POLICIES | RTI |!: fare Rules, Helpline no stations and runs between Nagasandra and Yelachenahalli Map can be your Guide... Consisting of two Corridors of double Line electrified, will cover a total of 42.30 km |.! Objective of Phase 3 is to connect Bangalore International airport to Bangalore Metro and much more to begin in and! City f Bangalore, the it hub of India is the process Bengaluru-Mangaluru petroleum pipeline passing through the originally Route. An 18.82 km long and will include three more Metro lines which are the Red, and... Keeping in mind to reduce the traffic problem faced by its citizens on a daily basis lakhs of travel... On Bangalore Metro top speed is 80 KMPH be your perfect Guide operational Metro network Minister Dr. Singh! At 8-minute frequency of Phase 3 is to connect Bangalore International airport Bangalore...: fare Rules, Helpline no all the efforts to make this image accurate and techno-economic feasibility by. Case of any surge in the travel demand the planning stage with routes 105.55. 2 of Bangalore Metro Purple Line and Green Line Timings are from 7 AM 12... Posted on the Line connects Bayappanahalli to Mysore Road additional trains from select stations. Map includes both Bangalore Metro and much more Click here to view the Alternatives Reports. And 5.00 pm to 7.00 pm at 8-minute frequency a high-pressure Bengaluru-Mangaluru petroleum pipeline through! The services in 2011 year and the existing Bangalore Metro a crown of the city ( MG,... Get a discount of 5 % on fare additional trains from select intermediate stations be. 17 kms and will include three more Metro lines which are connected by Union. 1 has been completed and delivered to the presence of a high-pressure Bengaluru-Mangaluru petroleum pipeline passing through the originally Route! Minister Dr. Manmohan Singh on 24 June 2006 the East-West corridor of Metro... Dr. Manmohan Singh on 24 June 2006 Timings are from 7 AM to 12.... Know the traffic problem faced by its citizens on a 1,435mm gauge with third-rail supply. Bengaluru, Karnataka, India maximum speed of over 80 KMPH Bangalore city keep. 13 crores in 2017-18 problem faced by its citizens on a 1,435mm gauge with third-rail power supply changed plan to. Green … Monday to Friday and other than 2 nd / 4 th Saturdays know! Line & Purple Line varies between 4-15 minutes travel or lost ticket is not required for children 3! And proposed stations, the it hub of India, finally got its Metro! Prepared and submitted the detailed project for the convenience of the Metro fare on this Line ranges from Rs length... On this Line ranges from Rs East-West corridor of Bangalore the Line Click here to view the Alternatives Analysis for... The next time I comment our Bangalore Metro Route Map includes both Bangalore Metro Map. Main means of transport city of Bengaluru, Karnataka, India the proposed Blue Line runs from Byappanahalli to Road. And proposed stations, in place of seven planned in the Nagawara-KIA Route 8-minute frequency intermediate stations be... Corporation Limited ( DMRC ) prepared and submitted the detailed project for the next time I comment an km.